Our diesel gala on Saturday 29th August is completely sold out – please do not travel to the railway if you have not booked.

May 14, 2026

Downpatrick East Cabin connected

May 2026 sees a huge leap forward for signalling and train control at our heritage railway – the commissioning of our first ever set of points controlled by a signal cabin. Downpatrick East Cabin was originally Bundoran East Cabin from the GNR Enniskillen-Derry line. It has seen extensive refurbishment to the lever frame over the […]